Tag Archives: Steel Fabrication Method

Steel Structure Fabrication Method Statement

Propose of this method statement is to describe the sequence of activities which will be followed to execute the steel structure fabrication works, including unloading of the raw materials and loading of fabricated materials to dispatch at project site. Below is list of plant machinery and necessary equipment for doing the fabrication of steel structure… Read More »

Structural Steel Work, Roofing System, Wall Cladding & Steel Decking Design Requirements

This article covers the design of connections and the fabrication, supply and erection of structural steel work, roofing system, wall cladding and steel decking. Below is a list of applicable standards and codes: BS 7668:1994, BS EN 10113, BS EN 10155, BS EN 10210; grade 43C: Structural Steel including sections facricated from steel BS4: Structural steel sections. … Read More »