Ready Mix Concrete Work Method Statement Including Formwork and Reinforcement Bars

This method statement covers the scope of work including the placement of formwork, reinforcement bars and ready mixed concrete. Arrange following equipment before start of the concrete works: Batching Plants Mobile Concrete Pumps Truck-mixers Air Compressor Mobile Water Tank Diesel Generator Risk

2025
Aug
9

Bituminous Roads, Kerbs, Tiles and Paver Block Installation Method Statement

Bituminous Roads, Kerbs, Tiles and Paver Block Installation Method Statement

This method statement represents the proposed construction procedure for the bituminous roads, kerbs, tiles and paver block installation activities. It is the overall responsibility of the project manager for road work, to ensure that the site preparation activities and safety requirements are

2025
Aug
8

Construction of Concrete Plinths for Blowers, Backwash Pumps and Transfer Pumps

Construction of concrete plinths for the Blowers, Backwash Pumps and Transfer Pumps

This method statement provide details and procedures which will and is to be followed for the successful construction of concrete plinths for the Blowers, Backwash Pumps and Transfer Pumps in the Machine Room. The Supervision of the installation will be done by

2025
Aug
7

Project Management Procedure for Managing Provisional Sum and Nominated Subcontractors

1. Purpose The purpose of this contract commercial management procedure is to establish the correct administration for the process of Provisional Sums and Nominated Subcontractors for the project. 2. Scope This procedure is applicable for all projects. 3. References Subcontractor and Major