Electrical Transformer Installation Method of Statement

This method statement explains and covers the installation & inspection of cast resin Transformers but can be useful for other types of transformers. The electrical standard procedure can be used for any kind of construction project covering the electrical scope of work.

2024
Apr
19

Method Statement of Concreting for Vertical Elements Retaining Wall, Shear Walls & Columns

method statement for concrete works

Below is a precise method statement for concrete works for vertical elements (Retaining Wall, Shear Walls, Columns etc.) Following equipment shall be arranged before starting the concrete pouring work: Survey Instruments Tower/Mobile Crane Mechanical Vibrators / Internal Vibrators Concrete Pumps Transit Mixer