Category Archives: Job Safety Analysis

Manual Handling Risk Assessment and Control Measures

This risk assessment is applicable for all persons involved in transporting or supporting of a load by 1 or more employees and includes lifting, putting down, pulling, pushing, carrying or moving a load, which, by reason of its  characteristics or of unfavorable ergonomic conditions, involves risks, particularly of back injuries to employees. Scope of this… Read More: Manual Handling Risk Assessment and Control Measures »

Slips, Trips and Falls Risk Assessment

This risk assessment is applicable for all kind of operations including the use of tools and equipment’s. Scope of the document is all  locations including sites, offices, stores, workshops, canteens, dry rooms, toilets etc. For all type of  work activities at the same level within the working environment including platforms. Hazards include: Cuts and Abrasions Laceration Serious bodily… Read More: Slips, Trips and Falls Risk Assessment »

Metallic Piping Fabrication and Installation Method Statement & Job Safety Analysis

This method statement covers the sequence of activities for fabrication, erection and installation procedure for Metallic Piping. The method is useful for carbon steels, alloy steels, stainless steels and nickel alloys systems. Procedure will help to ensure the compliance of piping works with the contractual applications and HSE requirements. Following equipment’s and tools shall be… Read More: Metallic Piping Fabrication and Installation Method Statement & Job Safety… »

Safe Work Method Statement & Risk Assessment for Excavation and Trenching

This safe work method statement SWMS details how specific risks associated with excavation, trenching and the location of underground services are to be managed and controlled. It outlines the common risks and dangers associated with this work and how to best control them. The control measures listed in this SWMS must be implemented on site.… Read More: Safe Work Method Statement & Risk Assessment for Excavation and… »

Job Safety Analysis For Screeding Civil Works & Download Link

Activity: Use of electrical equipment’s Hazards & Risks: Electrical Shock, Cables management issues, Personal Injury Control Measures: – Fire exit routes / Muster points shall be properly indicated by installation of signs. – Working areas shall be barricaded (only authorized personnel are allowed to enter). -Electrical Hand tools will be inspected before start the job… Read More: Job Safety Analysis For Screeding Civil Works & Download Link »

Construction Noise Control Measures, Plan and Procedure

This health and safety instruction provides information on the noise hazards and control measures regarding noise in the workplace with the view to prevent industrial hearing loss. The safety procedure is applicable for all kind of projects. Additional control measures may be required depending on project and country local legal occupational health and safety requirements… Read More: Construction Noise Control Measures, Plan and Procedure »