Project Management Procedure for Surveillance of Subcontractors’ Operations

In order to ensure quality in all aspects of the construction site, close watch of subcontractors’ operations is no doubt compulsory. Every contractor shall establish and document an appraisal system to verify their sub contractor’s implementation of and conformance to the project quality plan and contract technical specification requirements. The appraisal shall cover all the… Read More: Project Management Procedure for Surveillance of Subcontractors’ Operations »

Construction Project Documentation Procedure

Contractor’s QC documentation must cover all aspects of quality control program activities, and includes Daily Inspection Reports and Daily Test Reports. After quality control plan QCP approval by the client, the contractor will document the QC activities pursuant to the QCP. Daily Record Keeping Project documents will be managed through a combination of a secure… Read More: Construction Project Documentation Procedure »

Detailed Project Construction Methodology Civil Works & MEP Works

Below you can find a complete Project Specific Construction Methodology. Following are the sections or table of content included in the document: 1.0 Civil Works 2.0 Block Work 3.0 Plastering 4.0 Ceramic Floor and Wall Tiles – Granite and Terrazzo Tiles 5.0 Painting 6.0 Aluminium 7.0 Suspended Ceilings 8.0 External Works 9.0 Mechanical, Electrical &… Read More: Detailed Project Construction Methodology Civil Works & MEP Works »

Site Preparation and Mobilization Method Statement

This project method statement describes the construction methodology and procedures amidst other details for the actualization of the summary task i.e. site preparation in respect of the subject project for the Engineering, Procurement, Installation and Commissioning (EPIC) of project building. This Method Statement is however to read and applied in conjunction with Job Safety Analysis… Read More: Site Preparation and Mobilization Method Statement »

Design of Temporary Works for Completing Permanent Works on Projects

This procedure describes the requirements on the design of temporary works. The purpose of this procedure is to provide adequate drawings and method statements for the temporary works that are necessary for the completion of the permanent works. The design and / or verification of temporary works shall be performed by project personnel or external… Read More: Design of Temporary Works for Completing Permanent Works on Projects »

Construction Definitions & Terms – Beginning with A and B

A/C– An abbreviation for air conditioner or air conditioning. A/C Condenser– The outside fan unit of the Air Conditioning system. It removes the heat from the Freon gas and “turns” the gas back into a liquid and pumps the liquid back to the coil in the furnace. A/C Disconnect- The main electrical ON-OFF switch near… Read More: Construction Definitions & Terms – Beginning with A and B »