Job Safety Analysis For Screeding Civil Works & Download Link

Job Safety Analysis For Screeding Civil Works

Activity: Use of electrical equipment’s Hazards & Risks: Electrical Shock, Cables management issues, Personal Injury Control Measures: – Fire exit routes / Muster points shall be properly indicated by installation of signs. – Working areas shall be barricaded (only authorized personnel are

2020
Sep
25

Project Management Procedure for Surveillance of Subcontractors’ Operations

In order to ensure quality in all aspects of the construction site, close watch of subcontractors’ operations is no doubt compulsory. Every contractor shall establish and document an appraisal system to verify their sub contractor’s implementation of and conformance to the project

2020
Jun
30

Design of Temporary Works for Completing Permanent Works on Projects

Design of Temporary Works on Construction Projects

This procedure describes the requirements on the design of temporary works. The purpose of this procedure is to provide adequate drawings and method statements for the temporary works that are necessary for the completion of the permanent works. The design and /

2020
Apr
3

Document Control Procedure for Manual & Electronic Document Management System

Document Control Procedure for Quality Management System

The document control procedure of any company describes the control mechanisms to ensure that master documents are controlled with regards to their approval, revision, issue level, distribution and use. The control of documents procedure helps to ensure that the company’s environmental, health,