Category Archives: Risk Assessment

Workplace House Keeping Method for Site Contamination Control

The purpose of this procedure is to provide general guidelines for implementation of controls to reduce the risk of contaminating the workplace and the natural environment. This standards safety instruction applies to all project site workplaces for maintaining good house keeping. Building construction and any other civil engineering works often involve redevelopment of land which… Read More: Workplace House Keeping Method for Site Contamination Control »

Mobile Plant and Machinery Safe Operation Method Statement at Construction Project

The purpose of this safe work method statement is to provide direction to the project management team on assessing, managing, controlling and the general use of plant and equipment, along with the operators, on site to ensure maximum safe guards are in place. This work instruction addresses safety instructions for both projects and other workplaces… Read More: Mobile Plant and Machinery Safe Operation Method Statement at Construction… »

Vertical Bracing Construction Method of Steel Buildings Structure

Below is a precise method statement for erection and welding of vertical Bracing for steel buildings and structures as per the project requirements. Sequence of activities for Bracing Erection are as follows Receiving material from stores and temporarily stacking them if necessary in proper location. Fixing of ladder on the pipe bracing by proper welding.… Read More: Vertical Bracing Construction Method of Steel Buildings Structure »

Air Conditioning Installation of DX Split Units Including Refrigerant Piping & Brazing

This air conditioning method statement is developed for any kind of the project in order to achieve best quality of work at all levels for ac installation activity. Method Statement covers all the critical installation activities of air conditioning systems that includes refrigerant piping installation, brazing and air conditioning unit installation. Purpose of this procedure… Read More: Air Conditioning Installation of DX Split Units Including Refrigerant Piping… »

Abrasive Wheels Risk Assessment & Control Measures

This risk assessment is applicable for Chop Saws, Angle Grinders, Bench Grinders, cutting and grinding tasks in mechanical, fabrication and electrical disciplines. Hazards related to abrasive wheel include: Fire/explosion through ignition of sparks Bursting of abrasive wheel or disc at high speed Contact with wheel or disc resulting in laceration or amputation Losing control of the Equipment Clothing entanglement… Read More: Abrasive Wheels Risk Assessment & Control Measures »

Risk Assessment for Electrical Work Up To 415 Volts

This electrical risk assessment covers all operations related to electrical LV, MV inspection and testing. Related hazards include: Electrocution Electric Burn Fire Explosion Control Measures  5 Golden Rules to avoid accidents due to electricity: 1. Disconnect completely ( the apparatus on which you are to work) Live work is too avoided at all times (as… Read More: Risk Assessment for Electrical Work Up To 415 Volts »