Piping Insulation Procedure and Jacketing Method Statement

Piping Insulation and Jacketing Method Statement

Table of Content Purpose References Insulation Material Storage Of Materials Preparation Of Insulation Insulation Procedure Final Acceptance Inspection Procedure 1. Purpose The purpose of this method Statement is to describe the execution procedure for the supply and installation of Hot & Personnel Protection insulation works of Piping, Valves and Flanges.…
Site Preparation and Mobilization Method Statement

Site Preparation and Mobilization Method Statement

This project method statement describes the construction methodology and procedures amidst other details for the actualization of the summary task i.e. site preparation in respect of the subject project for the Engineering, Procurement, Installation and Commissioning (EPIC) of project building. This Method Statement is however to read and applied in…
Method Statement for Piling Works at Construction Project

Method Statement for Piling Works at Construction Project

The purpose of this civil work method statement is to define the procedure for piling construction works at a project in accordance with the requirements specified in the relevant specifications, procedures and drawings, considering safety and quality of the work activities. The scope of work may include piling construction works…
HDPE Pipe Welding Jointing for Drainage Installation

Construction Method of Statement for Installation of Above Ground Drainage System

This Method Statement covers the Installation of Above Ground Drainage System. This procedure defines the method to ensure that the installation has been carried out as per project contract requirements, specifications and best practices. It gives details of how the work will be carried out and what health and safety…
Concrete Pouring Method Statement for Construction Work using Ready Mix Concrete

Concrete Pouring Method Statement for Construction Work using Ready Mix Concrete

This civil work method statement shall address the requirements of project site operations applicable for the supply and placing of structural and nonstructural concrete pouring on the construction work project. Following this method of statement will ensure that concrete works activity will be expedite in an efficient and safe manner…
Project Management Procedure for Surveillance of Subcontractors’ Operations

Project Management Procedure for Surveillance of Subcontractors’ Operations

In order to ensure quality in all aspects of the construction site, close watch of subcontractors’ operations is no doubt compulsory. Every contractor shall establish and document an appraisal system to verify their sub contractor’s implementation of and conformance to the project quality plan and contract technical specification requirements. The…