The purpose of this method is to determine the crushing value of the given sample of aggregate for the road construction works. The Principal mechanical properties required in road stones are: Satisfactory resistance to crushing under the roller during construction and Adequate
Read More
CO– An abbreviation for “Certificate of Occupancy“. This certificate is issued by the local municipality and is required before anyone can occupy and live within the home. It is issued only after the local municipality has made all inspections and allmonies and
Read More
This document defines the method statement for the installation of AHU at construction site in compliance with the approved designs and approved material submittals. Prior to installation of AHU, the supervisor and foreman will verify and ensure that all the safety requirements have been complied with and
Read More
A/C– An abbreviation for air conditioner or air conditioning. A/C Condenser– The outside fan unit of the Air Conditioning system. It removes the heat from the Freon gas and “turns” the gas back into a liquid and pumps the liquid back to
Read More
Propose of this method statement is to describe the sequence of activities which will be followed to execute the steel structure fabrication works, including unloading of the raw materials and loading of fabricated materials to dispatch at project site. Below is list
Read More
For the design of bridges foundation, the scope of subsurface exploration shall be to determine soil parameters and rock characteristics and their suitability by insitu testing or testing of samples/cores taken out of exploration. It shall be planned in such a way
Read More