Method Statement for Installation of Central Battery System

The following procedure will be followed for installation of Central Battery system and can be customized as per the specific needs for different projects. Emergency lighting battery system shall be of modular construction with all modules being plug in type encapsulated design. The outgoing circuits shall be fed through changeover modules. Each module shall be capable… Read More »

Method Statement for Installation of Aluminum Glazed Windows, Doors & Louvers

Required Tools for installation of Aluminum Glazed Windows, Doors & Louvers: Hand Tools Drill Machine Glass suckers Sealant applicator Cutting saw Lifting belt Cradle/Scaffolds Tower/Mobile Crane INSTALLATION PROCEDURE FOR DOORS, WINDOWS & LOUVERS: Ensure all opening are as per the approved shop drawings. Cleaning of the dust on masonry opening of doors & windows with the… Read More »

PROJECT MANAGEMENT RESPONSIBILITIES OF THE ACOUSTIC NOISE CONTROL SPECIALIST CONSULTANT

Consultant has reviewed and is familiar with all drawings and equipment proposed to be furnished on the project.  The following analysis will be conducted: Noise Criteria: At the outset of our work, CONSULTANT will review the latest relevant design documents and determine appropriate acoustical criteria. Where these are not defined in the Building Specification, CONSULTANT… Read More »

Standard Requirements for Curtain Walling System

This pages mentions requirements for the provision of design, manufacture, supply, delivery, storage, assembly, fixing, installation, testing and commissioning of curtain walling system and all windows and glazed spandrels The Contractor will be required to produce full working drawings and details showing the construction, fabrication or manufacture, assembly and installation of the curtain wall system.… Read More »

Concrete Pile Works and Load Testing Requirements

All materials to be used for the piling concrete works shall meet the requirements as specified under relevant specifications of a project, and any cement to be used for concrete piles shall be a suitable combination of GGBFS,  satisfying ASTM C989, CEM II to BS EN 197-1:200 or BS 4246-1996 & OPC type I to… Read More »

Method Statement For Water Proofing Works

Purpose of the method statement The purpose of this method statement is to outline the sequences and methods of works intended to be used for the execution of substructure waterproofing of building basement raft slab &  basement walls. The Contractor reserves the right to adapt the methods of execution as contained in this document, modification to… Read More »