This Method Statement describes the hse management arrangements and systems of work to be adopted by Company during civil engineering and Infrastructure groundwork operations. The document, with its appended risk assessment, will suffice for the majority of works undertaken by the company
Read More
1.0 PURPOSE: To ensure that the installation of reinforcing bars are executed safely and in accordance with the contract requirements and that all quality assurance/ control activities are conducted in a systematic manner, works are inspected and conformance is verified and documented. 2.0
Read More
Below is a detailed method statement for Installation of EOT Overhead Gantry Crane. EOT crane installation shall be in accordance with the project requirements and crane manufacturer installation instructions. This method statement also describes the installation of overhead gantry crane for the
Read More
Table of Contents 1.0 Introduction 2.0 Purpose and Scope 3.0 Document Control 4.0 Reference Documents 5.0 Definitions, Terms and Abbreviations 6.0 Responsibility 7.0 Materials and Equipment 8.0 Resources 9.0 Methodology / Procedure 10.0 Permit 11.0 Quality Control 12.0 Health, Safety and Environment
Read More
CLIENT PROJECT RESPONSIBILITIES The Clients’ duties and responsibilities include: Obtain and provide the Project Manager with all necessary information (including reports and other relevant documentation) in its possession which relates to the Project execution and control. Provide the Project Manager in timely
Read More
EQUIPMENT / MACHINERY REQUIRED: Hydraulic Power Pack, HILTI DLP 30 : 2 Nos. Hydraulic Saw Head, HILTI DSTS 30 : 2 Nos. Hydraulic Hoses (set of 6 hoses) : 2 Nos. Remote Control : 2 Nos. Coring Machines HILTI DD250 : 2
Read More