Before start of drainage system piping installation and testing completeness of the related works and systems shall be ensured by physical inspections and interpreting the previously submitted and approved work inspection reports/records. Make sure that all tools/equipment/instruments required are calibrated and having
Read More
Below is a brief mechanical HVAC method statement that covers the installation of chilled water CHW piping system. This procedure defines the method used to ensure that the piping installation has been carried out as per contract requirements and best practices. Also
Read More
The purpose of this construction methodology is to specify the requirements of civil building construction activities including excavation, backfilling, and allied activities complying with the contract documents, project specifications as per the scope of work and approved drawings/documents. This method statement also
Read More
This mechanical method statement covers the installation of fire sprinkler system piping network. Procedure defines the method used to ensure the installation has been carried out as per contract requirements and best industry practices. The method statement gives details of how the
Read More
This method statement describes the overall sequence of the traffic diversions that will be carried out at a construction project site. It also outlines the materials used, machinery and equipment involved for ensuring the works are carried out safely and in compliance
Read More
This Method Statement covers the installation of uPVC and HDPE pipes for use with the underground and substructure drainage piping systems. Procedure defines the method used to ensure the underground drainage pipework installation has been carried out as per technical specifications and
Read More