2025
May
3

Project Completion and Handover Procedure

Project Completion and Handover Procedure

The purpose of the procedure is to ensure that key issues during the Project Completion stage of the construction cycle are administered in accordance with the Main Contract, including: – Taking Over Certificates – Defects Liability – Final Payment Application/Certificates For the

2025
Apr
20

PROJECT MANAGEMENT RESPONSIBILITIES FOR THE SPECIALIST AUDIO VISUAL AV CONSULTANT

PROJECT MANAGEMENT RESPONSIBILITIES FOR THE SPECIALIST AUDIO VISUAL AV CONSULTANT All required design works are to be carried out to internationally recognized standards, in compliance with local codes and regulations and to the owner hotel operator’s requirements incorporating the latest standards and

2025
Apr
15

Metallic Piping Fabrication and Installation Method Statement & Job Safety Analysis

Typical Piping Lifting Installation Plan

This method statement covers the sequence of activities for fabrication, erection and installation procedure for Metallic Piping. The method is useful for carbon steels, alloy steels, stainless steels and nickel alloys systems. Procedure will help to ensure the compliance of piping works

2025
Apr
6

Method Statement for Installation of Aluminum Glazed Windows, Doors & Louvers

Required Tools for installation of Aluminum Glazed Windows, Doors & Louvers: Hand Tools Drill Machine Glass suckers Sealant applicator Cutting saw Lifting belt Cradle/Scaffolds Tower/Mobile Crane INSTALLATION PROCEDURE FOR DOORS, WINDOWS & LOUVERS: Ensure all opening are as per the approved shop drawings.

error: Content is protected !!