The purpose of the procedure is to ensure that key issues during the Project Completion stage of the construction cycle are administered in accordance with the Main Contract, including: – Taking Over Certificates – Defects Liability – Final Payment Application/Certificates For the
Read More
PROJECT MANAGEMENT RESPONSIBILITIES FOR THE SPECIALIST AUDIO VISUAL AV CONSULTANT All required design works are to be carried out to internationally recognized standards, in compliance with local codes and regulations and to the owner hotel operator’s requirements incorporating the latest standards and
Read More
This method statement covers the sequence of activities for fabrication, erection and installation procedure for Metallic Piping. The method is useful for carbon steels, alloy steels, stainless steels and nickel alloys systems. Procedure will help to ensure the compliance of piping works
Read More
PROJECT RESPONSIBILITIES OF THE INTERIOR DESIGNER AT DIFFERENT STAGES PHASE 1 – CONCEPT DESIGN: The I.D Consultant will initially: Analyze the concept space planning with the Engineers and review the architectural layout to enhance and optimize the interior planning, circulation and special relationship
Read More
The following procedure will be followed for installation of Central Battery system and can be customized as per the specific needs for different projects. Emergency lighting battery system shall be of modular construction with all modules being plug in type encapsulated design. The
Read More
Required Tools for installation of Aluminum Glazed Windows, Doors & Louvers: Hand Tools Drill Machine Glass suckers Sealant applicator Cutting saw Lifting belt Cradle/Scaffolds Tower/Mobile Crane INSTALLATION PROCEDURE FOR DOORS, WINDOWS & LOUVERS: Ensure all opening are as per the approved shop drawings.
Read More