This procedure describes the requirements on the design of temporary works. The purpose of this procedure is to provide adequate drawings and method statements for the temporary works that are necessary for the completion of the permanent works. The design and /
Read More
The purpose of this method statement is to define the procedure for the preparation of pile caps before starting of the waterproofing and the pile head treatment. The sequence of work shall be Piling , Dewatering, Excavation to remove the soil and
Read More
Below is a detailed procedure for construction of pipe culverts for any kind of road or pavement project. Detailed working drawing will be prepared & submitted for approval for each and every culvert pipe works. After the site has been surveyed, the
Read More
This safe work method statement SWMS details how specific risks associated with excavation, trenching and the location of underground services are to be managed and controlled. It outlines the common risks and dangers associated with this work and how to best control
Read More
This is a precise method statement that can help you to assure that brickworks are installed properly and inspected and confirmed in accordance with drawings, specification and good working practice. Following tools and materials shall be available before start of work. Brick
Read More
This method statement provide details and procedures which will and is to be followed for the successful construction of concrete plinths for the Blowers, Backwash Pumps and Transfer Pumps in the Machine Room. The Supervision of the installation will be done by
Read More