This is a precise method statement that can help you to assure that brickworks are installed properly and inspected and confirmed in accordance with drawings, specification and good working practice. Following tools and materials shall be available before start of work. Brick
Read More
This method statement provide details and procedures which will and is to be followed for the successful construction of concrete plinths for the Blowers, Backwash Pumps and Transfer Pumps in the Machine Room. The Supervision of the installation will be done by
Read More
1. Purpose 2. Scope 3. Definitions 4. Responsibilities 5. Safety 5.1 Machinery and Equipment 5.2 Personal Protective Equipment 5.3 Safety Arrangement during the foundation work 6. Working Method 6.1 Preparing Work 6.2 Survey and Setting out 6.3 Excavation 6.4
Read More
This method statement outlines the procedure and methodology for the site compound set up, including Parking and Material Storage. Typically contracts manager, site agent, foreman and a suitably qualified ecologist is responsible for this activity. Other employees who are directly involved include
Read More
This method statement covers the scope of work including the placement of formwork, reinforcement bars and ready mixed concrete. Arrange following equipment before start of the work: Batching Plants 1-2 Mobile Concrete Pumps 1-4 Truck-mixers 1-8 Air Compressor 1-3 Mobile Water Tank
Read More
1.0 PURPOSE: To ensure that the installation of reinforcing bars are executed safely and in accordance with the contract requirements and that all quality assurance/ control activities are conducted in a systematic manner, works are inspected and conformance is verified and documented. 2.0
Read More