This method statement describes step by step the detailed requirements and procedure of site mobilization in accordance with the contract requirement and specifications. RESPONSIBILITIES Project Manager : Ensure all required submittal are made in a timely manner. Work progress is carried out
Read More
Table of Contents 1.0 Introduction 2.0 Purpose and Scope 3.0 Document Control 4.0 Reference Documents 5.0 Definitions, Terms and Abbreviations 6.0 Responsibility 7.0 Materials and Equipment 8.0 Resources 9.0 Methodology / Procedure 10.0 Permit 11.0 Quality Control 12.0 Health, Safety and Environment
Read More
Following equipment and tools may be used as required during Wet Area Water Proofing works. Wire Brushes Soft Brushes Air Compressor Empty containers / drums Stirrer / Rod Paint Brushes Paint rollers Wheel barrow Spatula Other hand tools Waterproof 360 PU (Liquid
Read More
The aim of this Method Statement is to provide and maintain effective quality control procedures and to execute the construction work in compliance to standard and good practice at all stages and activities for the Erection & Dismantling of the Slab Formwork
Read More
This method statement provides the control sequence and installation methodology that will be used for supply, laying and fixing or installation of Stone Flooring (Marble/Granite Flooring), Finishes shown on the approved Shop Drawings or finishing schedules in compliance with the Project Specification.
Read More
EQUIPMENT / MACHINERY REQUIRED: Hydraulic Power Pack, HILTI DLP 30 : 2 Nos. Hydraulic Saw Head, HILTI DSTS 30 : 2 Nos. Hydraulic Hoses (set of 6 hoses) : 2 Nos. Remote Control : 2 Nos. Coring Machines HILTI DD250 : 2
Read More