1. Purpose 2. Scope 3. Definitions 4. Responsibilities 5. Safety 5.1 Machinery and Equipment 5.2 Personal Protective Equipment 5.3 Safety Arrangement during the foundation work 6. Working Method 6.1 Preparing Work 6.2 Survey and Setting out 6.3 Excavation 6.4
Read More
This method statement outlines the procedure and methodology for the site compound set up, including Parking and Material Storage. Typically contracts manager, site agent, foreman and a suitably qualified ecologist is responsible for this activity. Other employees who are directly involved include
Read More
This method statement covers the scope of work including the placement of formwork, reinforcement bars and ready mixed concrete. Arrange following equipment before start of the work: Batching Plants 1-2 Mobile Concrete Pumps 1-4 Truck-mixers 1-8 Air Compressor 1-3 Mobile Water Tank
Read More
1.0 PURPOSE: To ensure that the installation of reinforcing bars are executed safely and in accordance with the contract requirements and that all quality assurance/ control activities are conducted in a systematic manner, works are inspected and conformance is verified and documented. 2.0
Read More
This method statement describes step by step the detailed requirements and procedure of site mobilization in accordance with the contract requirement and specifications. RESPONSIBILITIES Project Manager : Ensure all required submittal are made in a timely manner. Work progress is carried out
Read More
Table of Contents 1.0 Introduction 2.0 Purpose and Scope 3.0 Document Control 4.0 Reference Documents 5.0 Definitions, Terms and Abbreviations 6.0 Responsibility 7.0 Materials and Equipment 8.0 Resources 9.0 Methodology / Procedure 10.0 Permit 11.0 Quality Control 12.0 Health, Safety and Environment
Read More