This method statement covers the procedure involved in handling and installation of underground GRP/FRP piping in a trench. The purpose is intended to assist the client, customer/ installer in understanding the requirements for the successful GRP pipe handling and installation. The recommendations
Read More
Necessary tools required for installation works: Hand tools (hammer, rubber hammer, chisel, screw driver etc.) Spirit level Jig Saw Manual Circular Saw Drilling Machines Miter Saw Cordless Drills PROCEDURE FOR WOODEN DOORS: All Submittals, Fabrication and Manufacture, Product Delivery and Storage shall
Read More
This is a precise method statement that can help you to assure that brickworks are installed properly and inspected and confirmed in accordance with drawings, specification and good working practice. Following tools and materials shall be available before start of work. Brick
Read More
1.0 PURPOSE: To ensure that the installation of reinforcing bars are executed safely and in accordance with the contract requirements and that all quality assurance/ control activities are conducted in a systematic manner, works are inspected and conformance is verified and documented. 2.0
Read More
Below is a detailed method statement for Installation of EOT Overhead Gantry Crane. EOT crane installation shall be in accordance with the project requirements and crane manufacturer installation instructions. This method statement also describes the installation of overhead gantry crane for the
Read More
Table of Contents 1.0 Introduction 2.0 Purpose and Scope 3.0 Document Control 4.0 Reference Documents 5.0 Definitions, Terms and Abbreviations 6.0 Responsibility 7.0 Materials and Equipment 8.0 Resources 9.0 Methodology / Procedure 10.0 Permit 11.0 Quality Control 12.0 Health, Safety and Environment
Read More