EQUIPMENT / MACHINERY REQUIRED: Hydraulic Power Pack, HILTI DLP 30 : 2 Nos. Hydraulic Saw Head, HILTI DSTS 30 : 2 Nos. Hydraulic Hoses (set of 6 hoses) : 2 Nos. Remote Control : 2 Nos. Coring Machines HILTI DD250 : 2
Read More
Required Tools for installation of Aluminum Glazed Windows, Doors & Louvers: Hand Tools Drill Machine Glass suckers Sealant applicator Cutting saw Lifting belt Cradle/Scaffolds Tower/Mobile Crane INSTALLATION PROCEDURE FOR DOORS, WINDOWS & LOUVERS: Ensure all opening are as per the approved shop drawings.
Read More
Purpose of the method statement The purpose of this method statement is to outline the sequences and methods of works intended to be used for the execution of substructure waterproofing of building basement raft slab & basement walls. The Contractor reserves the right
Read More
This procedure is prepared to define and establish the method statement of Hydroseeding Mix application. Project manager is responsible to ensure that method statement comply with client requirements and its submission and approval as well. Construction manager is responsible to monitor implementation
Read More
This safe work method statement SWMS details how specific risks associated with excavation, trenching and the location of underground services are to be managed and controlled. It outlines the common risks and dangers associated with this work and how to best control
Read More
Following equipment and tools may be used as required during Wet Area Water Proofing works. Wire Brushes Soft Brushes Air Compressor Empty containers / drums Stirrer / Rod Paint Brushes Paint rollers Wheel barrow Spatula Other hand tools Waterproof 360 PU (Liquid
Read More