The purpose of this construction methodology is to specify the requirements of civil building construction activities including excavation, backfilling, and allied activities complying with the contract documents, project specifications as per the scope of work and approved drawings/documents. This method statement also
Read More
This method statement describes the overall sequence of the traffic diversions that will be carried out at a construction project site. It also outlines the materials used, machinery and equipment involved for ensuring the works are carried out safely and in compliance
Read More
The purpose of this procedure is to determine the specific gravity and water absorption of given sample of aggregates for road works. Specific gravity of an aggregate is considered to be a measure of strength or quality of the material. Stones having
Read More
Below is best construction method statement that also covers the quality planning at construction site of civil engineering project. Below is list of activities that are covered in this civil contractor method of statement. Excavation work, including soil excavation, soil disposal, backfill
Read More
The below method statement is helpful for the building civil finishing works for any kind of project. Minimum site safety requirements are Safety Glasses, Safety Footwear, Helmet and High Visibility Vest. Any additional PPE as per the task risk assessment. Solid brick,
Read More
Aggregates form the major portion of pavement structure and they form the prime materials used in pavement construction. Aggregates have to bear stresses occurring due to the wheel loads on the pavement and on the surface course they also have to resist
Read More