Category Archives: Mechanical Method Statement

Piping Insulation and Jacketing Method Statement

Table of Content Purpose References Insulation Material Storage Of Materials Preparation Of Insulation Insulation Procedure Final Acceptance Inspection Procedure 1. Purpose The purpose of this method Statement is to describe the execution procedure for the supply and installation of Hot & Personnel Protection insulation works of Piping, Valves and Flanges. This method statement provides the… Read More: Piping Insulation and Jacketing Method Statement »

Method of Statement for Installation of Natural Gas System, Pipe Work, Distribution Lines and Branches

This method of statement is applicable for the installation of Natural Gas System, pipe work, distribution lines, gas branches inside the retails of the Building (regulators, gas meters, valves, etc.) for the building project. Project manager will have the overall responsibility of the Project for execution, quality and safety. Also he will maintain the planning… Read More: Method of Statement for Installation of Natural Gas System, Pipe… »

Project Landscaping Automatic Irrigation Works Method Statement

The objectives of this method statement is to briefly describe the major activities and set inspection milestones for irrigation system installation. Purpose of this procedure is to establish general guidelines addressing major requirements that are necessary to ensure that irrigation work conforms to the project drawings, design and specifications. This method statement explains and covers… Read More: Project Landscaping Automatic Irrigation Works Method Statement »

GRP / FRP Pipe Installation Method Statement

This method statement covers the procedure involved in handling and installation of underground GRP/FRP piping in a trench. The purpose is intended to assist the client, customer/ installer in understanding the requirements for the successful GRP pipe handling and installation. The recommendations given in this plumbing method statement are easy to follow and implement. This… Read More: GRP / FRP Pipe Installation Method Statement »

Steel Structure Fabrication Method Statement

Propose of this method statement is to describe the sequence of activities which will be followed to execute the steel structure fabrication works, including unloading of the raw materials and loading of fabricated materials to dispatch at project site. Below is list of plant machinery and necessary equipment for doing the fabrication of steel structure… Read More: Steel Structure Fabrication Method Statement »

Method Statement For Supply & Installation of EOT Cranes

Below is a detailed method statement for Installation of EOT Overhead Gantry Crane. EOT crane installation shall be in accordance with the project requirements and crane manufacturer installation instructions. This method statement also describes the installation of overhead gantry crane for the pump rooms, cooling plants and maintenance and erection workshops etc. Project manager is… Read More: Method Statement For Supply & Installation of EOT Cranes »