Project Completion and Handover Procedure

Project Completion and Handover Procedure

The purpose of the procedure is to ensure that key issues during the Project Completion stage of the construction cycle are administered in accordance with the Main Contract, including: – Taking Over Certificates – Defects Liability – Final Payment Application/Certificates For the

2025
Apr
20

PROJECT MANAGEMENT RESPONSIBILITIES FOR THE SPECIALIST AUDIO VISUAL AV CONSULTANT

PROJECT MANAGEMENT RESPONSIBILITIES FOR THE SPECIALIST AUDIO VISUAL AV CONSULTANT All required design works are to be carried out to internationally recognized standards, in compliance with local codes and regulations and to the owner hotel operator’s requirements incorporating the latest standards and

2025
Mar
25

PROJECT MANAGEMENT RESPONSIBILITIES OF THE ACOUSTIC NOISE CONTROL SPECIALIST CONSULTANT

Consultant has reviewed and is familiar with all drawings and equipment proposed to be furnished on the project.  The following analysis will be conducted: Noise Criteria: At the outset of our work, CONSULTANT will review the latest relevant design documents and determine

2025
Feb
23

Project Audit & Review Checklist in Editable Document Format

Project Audit & Review Checklist in editable format

The following provides a detailed checklist to assist in reviewing the health of a project at pre and post implementation stage. The full documents is available to download, just keep reading and download if you like. 1. Project Planning 1.1 Does the