Project Life Cycle HSE Management Activities – Civil Engineering & Infrastructure Work

This Method Statement describes the hse management arrangements and systems of work to be adopted by Company during civil engineering and Infrastructure groundwork operations. The document, with its appended risk assessment, will suffice for the majority of works undertaken by the company

2019
Jun
29

Reinforcing Bars Fabrication and Installation Method Statement

reinforcement bar method statement

1.0 PURPOSE: To ensure that the installation of reinforcing bars are executed safely and in accordance with the contract requirements and that all quality assurance/ control activities are conducted in a systematic manner, works are inspected and conformance is verified and documented. 2.0

2019
Mar
25

Method Statement Template for Construction of Temporary Causeway & Jetty

Table of Contents 1.0      Introduction 2.0      Purpose and Scope 3.0      Document Control 4.0      Reference Documents 5.0      Definitions, Terms and Abbreviations 6.0      Responsibility 7.0      Materials and Equipment 8.0      Resources 9.0      Methodology / Procedure 10.0    Permit 11.0    Quality Control 12.0    Health, Safety and Environment

2016
Apr
27

Project Flow Chart / Work Instruction Summary

Below is list of activities which are involved from beginning of a project i.e. from project tender stage up to handing over and final close out after the defect liability period. This can be helpful for new comers in construction industry to

2016
Apr
25

PROJECT MANAGEMENT RESPONSIBILITIES OF THE ACOUSTIC NOISE CONTROL SPECIALIST CONSULTANT

Consultant has reviewed and is familiar with all drawings and equipment proposed to be furnished on the project.  The following analysis will be conducted: Noise Criteria: At the outset of our work, CONSULTANT will review the latest relevant design documents and determine