Method Statement for Installation of Stone Cladding Works

The following equipment and tools shall be provided with the necessary numbers to suit the numbers of skilled fixers: Leveling Instruments Masonry Tools Brushes Rubber Mallets Spirit Levels Adjustable Wrenches Open Wrenches Stone Steel Holders Spatulas Aluminum Straight Edge Measurement Tapes Stone Cutting Machine/Power Saw Plumb Line and Plastic Strings Steel Hammers Masking Tapes, etc.… Read More »

Method Statement For Painting Works

All painting works shall be carried out strictly in accordance with approved paint manufacturer’s recommendations and relevant applicable standards. Application of Painting system to the internal/external surfaces shall be as approved by the CONSULTANT and as required in compliance with manufacturer’s recommendations, approved method statement, drawings and project specifications. Before commencing the painting works, subsequent… Read More »

Method Statement For The Installation Of EOT And Monorails Crane Anchor & Runway Beams

Lifting Equipment: Chain block / Lever Block used to lifting the beams at the installation area. Usually use to help workers to lift the beams at low level height before fixing the connection bolts the same also for aligning the connection of the beams. Rotating & Power Machines: Welding Machines (if required at site during installation –… Read More »

Quality & HSE Management System Manual Structure

Below is Table of content for a typical Management System Manual which can be used for developing the manuals for quality, safety or HSE systems. 1. PURPOSE & SCOPE 1.1.       Vision, Mission and Values 1.2.       Our Core Values 1.3.       Our Stakeholders 1.4.       Outline Organisation Structure – Appendix B 1.5.       Policy Statement –… Read More »

Project Management Procedures & Their Importance

Project management is the discipline of carefully projecting or planning, organizing, motivating and controlling resources to achieve specific goals and meet specific success criteria. A project is a temporary endeavor designed to produce a unique product, service or result with a defined beginning and end (usually time-constrained, and often constrained by funding or deliverable’s) undertaken… Read More »

Job Safety Analysis For Screeding Civil Works & Download Link

Activity: Use of electrical equipment’s Hazards & Risks: Electrical Shock, Cables management issues, Personal Injury Control Measures: – Fire exit routes / Muster points shall be properly indicated by installation of signs. – Working areas shall be barricaded (only authorized personnel are allowed to enter). -Electrical Hand tools will be inspected before start the job… Read More »