Contractor’s QC documentation must cover all aspects of quality control program activities, and includes Daily Inspection Reports and Daily Test Reports. After quality control plan QCP approval by the client, the contractor will document the QC activities pursuant to the QCP. Daily
Read More
This procedure describes the requirements on the design of temporary works. The purpose of this procedure is to provide adequate drawings and method statements for the temporary works that are necessary for the completion of the permanent works. The design and /
Read More
The purpose of this method statement is to define the procedure for the preparation of pile caps before starting of the waterproofing and the pile head treatment. The sequence of work shall be Piling , Dewatering, Excavation to remove the soil and
Read More
Below is a detailed procedure for construction of pipe culverts for any kind of road or pavement project. Detailed working drawing will be prepared & submitted for approval for each and every culvert pipe works. After the site has been surveyed, the
Read More
Below is brief job description of technical department in order to achieve best quality results and complying the customer requirements. Raise suggestions to improve the system of working within the project and the company and follow the relevant management system procedures. Follow
Read More
Below is brief description of quality manager job description for an organization. This page covers mainly contractor quality control manager responsibilities. The Quality Control Manager will report directly to the On-site Project Manager with matters concerning quality control. He will have both
Read More