Project Audit & Review Checklist in Editable Document Format

The following provides a detailed checklist to assist in reviewing the health of a project at pre and post implementation stage. The full documents is available to download, just keep reading and download if you like. 1. Project Planning 1.1 Does the project have a formal Project Plan? 1.2 Are the key elements of a… Read More »

Requirements for Road Marking Paint For Pavements centreline, edge lines, cross walks etc.

Permanent Markings for Concrete Surfaces Two part epoxide resin paint shall be used for marking concrete surfaces. The paint shall give a matt or semi-gloss finish and is to be formulated on a catalyst cured epoxide resin base. The material should be fuel resistant. The paint shall consist of non-volatile constituents and solvents of which… Read More »

Project Commercial Management Procedure for Insurance Policies

1.0 Purpose of Procedure To ensure that: All aspects of project insurances are appropriately arranged and administered to protect the Company’s best interests and to meet acceptable risk profile including (but not limited to) Construction All Risk (CAR), Third Party Public Liability (TPL), Professional Indemnity (PI) and Difference In Conditions (DIC) policies where appropriate. Subcontractors,… Read More »

Hydroseeding Mix Application Method Statement

This procedure is prepared to define and establish the method statement of Hydroseeding Mix application. Project manager is responsible to ensure that method statement comply with client requirements and its submission and approval as well. Construction manager is responsible to monitor implementation of this method statement and ensure the works are carried out as per… Read More »

Formworks and Accessories Requirements for Concrete Casting

Formwork and falsework shall be so constructed that they will support the loads imposed on them by the fresh concrete together with additional stresses imposed by vibrating equipment and by construction traffic, so that after the concrete has hardened the formed faces shall be in the positions shown on the drawings within the tolerances set… Read More »