GRP Lining and Ladder Installation in Water Tank

Below is a precise method of statement covering the GRP lining and ladder installation in water tank. There shall be many other sections like scope of work, responsibilities references etc. but we have given below only the specific installation steps. Following tools shall be arranged before starting the GRP lining and ladder installation works. Mohair… Read More »

Method Statement For Temporary Sheet Piling / Shoring

Before starting the works following equipment shall be arranged. QUY80A Hydraulic Crawler Crane 80t – Lattice boom crawler crane with retractable tracks, suitable for work on a leveled platform. ICE815C Vibratory Hammer with power pack- 1 Nos. Procedure for Temporary Sheet Piling / Shoring The vibratory hammer is a purpose-built hydraulically driven hammer complete with… Read More »

Method Statement for Erection and Dismantling of Slab Formwork

General Requirements: Formwork shall be so constructed that it will support the loads imposed on it by fresh concrete together with additional stresses imposed by vibrating equipment and by construction traffic. For the construction of structural floor slabs formwork shall be used as per shop drawings and manufacturer’s recommendations. The PD 8 Shoring Tower &… Read More »

Method Statement of Concreting for Vertical Elements Retaining Wall, Shear Walls & Columns

Below is a precise method statement for concrete works for vertical elements (Retaining Wall, Shear Walls, Columns etc.) Following equipment shall be arranged before starting the concrete pouring work: Survey Instruments Tower/Mobile Crane Mechanical Vibrators / Internal Vibrators Concrete Pumps Transit Mixer Trucks Batching Plant All necessary Hand Tools Safety Equipment’s Concreting Method For Vertical… Read More »

Method Statement For Roof Waterproofing System

Following equipment and tools will be used as required during Roof Waterproofing System. Wire Brushes Soft Brushes Air Compressor Paint Brushes Paint rollers Scissors / Cutters Torch with Gas Cylinders etc. Wheel barrow Spatula Other Hand Tools etc. PROCEDURE FOR WATER PROOFING: STORAGE AND HANDLING OF MATERIALS: Materials shall be stored in a cool and… Read More »

Superstructure Concrete Method Statement

Below is a precise method statement for superstructure concrete works which is applicable for any kind of the project. Setting out: Prior to the commencement of the works, confirm and establish all reference points and levels. Locate, confirm and protect control points prior to starting the site concrete works. Formwork Requirements Make sure that the formworks… Read More »