The aim of this Method Statement is to provide and maintain effective quality control procedures and to execute the construction work in compliance to standard and good practice at all stages and activities for the Erection & Dismantling of the Slab Formwork
Read More
This method statement provides the control sequence and installation methodology that will be used for supply, laying and fixing or installation of Stone Flooring (Marble/Granite Flooring), Finishes shown on the approved Shop Drawings or finishing schedules in compliance with the Project Specification.
Read More
EQUIPMENT / MACHINERY REQUIRED: Hydraulic Power Pack, HILTI DLP 30 : 2 Nos. Hydraulic Saw Head, HILTI DSTS 30 : 2 Nos. Hydraulic Hoses (set of 6 hoses) : 2 Nos. Remote Control : 2 Nos. Coring Machines HILTI DD250 : 2
Read More
Purpose of the method statement The purpose of this method statement is to outline the sequences and methods of works intended to be used for the execution of substructure waterproofing of building basement raft slab & basement walls. The Contractor reserves the right
Read More
Below is list of activities which are involved from beginning of a project i.e. from project tender stage up to handing over and final close out after the defect liability period. This can be helpful for new comers in construction industry to
Read More
The Contractor shall undertake and complete the Works in accordance with the requirements of the construction Contract and shall liaise and consult with the Project Manager and the Engineer in administrating, coordinating and managing the project in accordance with its own approved
Read More