Below is a precise method statement for superstructure concrete works which is applicable for any kind of the project. Setting out: Prior to the commencement of the works, confirm and establish all reference points and levels. Locate, confirm and protect control points prior
Read More
Dewatering is defined as the removal of the ground water to a level below the normal water table, to enable excavation and construction to be carried out in suitable and safe working condition. It is proposed to install a single-stage well point
Read More
This electrical safework method statement describes the management arrangements and system of work to adopted for the laying cable for the electrical project. Below is necessary tools & equipment for performing the site activities for laying the cable. Cable Rollers Cable Pulling
Read More
This air conditioning method statement is developed for any kind of the project in order to achieve best quality of work at all levels for ac installation activity. Method Statement covers all the critical installation activities of air conditioning systems that includes
Read More
This Work Method Statement (WMS) is to describe the method for the CO2 fire suppression system installation & pressure testing for any kind of a project. The aim and /or benefit of complying with this method of statement includes the project specifications
Read More
Were the project objectives (expected outcomes) Accomplished? Explanation if required Were all Deliverable submitted and accepted? Explanation if required Did the Client/Engineer verify that all deliverable met the requirements? Explanation if required Have all subcontracts been closed? Explanation if required Have all final payments been made? (i.e., invoices
Read More