Below is a precise method statement that covers the installation of HVAC Ducting Outlets i.e. Grills and Diffusers. Scope of work includes all the ductwork for the project covering the outlets as per the approved schedule. Project manager is overall responsible for
Read More
The purpose of this plumbing method statement is to define the procedure for the preparation and construction of gravity sewer lines with GRP pipes with associated inspection chambers, manholes in accordance with the requirements specified in the relevant specifications 0considering safety and
Read More
Before start of drainage system piping installation and testing completeness of the related works and systems shall be ensured by physical inspections and interpreting the previously submitted and approved work inspection reports/records. Make sure that all tools/equipment/instruments required are calibrated and having
Read More
Below is a brief mechanical HVAC method statement that covers the installation of chilled water CHW piping system. This procedure defines the method used to ensure that the piping installation has been carried out as per contract requirements and best practices. Also
Read More
This mechanical method statement covers the installation of fire sprinkler system piping network. Procedure defines the method used to ensure the installation has been carried out as per contract requirements and best industry practices. The method statement gives details of how the
Read More
This Method Statement covers the installation of uPVC and HDPE pipes for use with the underground and substructure drainage piping systems. Procedure defines the method used to ensure the underground drainage pipework installation has been carried out as per technical specifications and
Read More