General Questions & Answers Related to Construction Field

1. What is the difference between working stress approach and limit state approach? For working stress approach, service loads are used in the whole design and the strength of material is not utilized in the full extent. In this method of design, stresses acting on structural members are calculated based on elastic method and they… Read More »

Hydrostatic Pressure Testing of Spherical Pressure Vessels – Method Statement

The purpose of this method statement is to make sure that hydrostatic pressure testing of spherical tanks is done safely as per client requirements, specifications and applicable local and international standards. Method statement is applicable for saturated and unsaturated LPG storage and intermediate tanks. Project manager has the overall responsibility for implementing and ensuring compliance… Read More »

Electrical Transformer Installation Method of Statement

This method statement explains and covers the installation & inspection of cast resin Transformers but can be useful for other types of transformers. The electrical standard procedure can be used for any kind of construction project covering the electrical scope of work. Overall project manager is responsible for implementation of method statement and relevant forms… Read More »

Detailed Project Construction Methodology

Below you can find a complete Project Specific Construction Methodology. Following are the sections or table of content included in the document: 1.0 Civil Works 2.0 Block Work 3.0 Plastering 4.0 Ceramic Floor and Wall Tiles – Granite and Terrazzo Tiles 5.0 Painting 6.0 Aluminium 7.0 Suspended Ceilings 8.0 External Works 9.0 Mechanical, Electrical &… Read More »

AC Installation Method Statement for Split Unit / Mini Split

Below is a brief HVAC method statement that covers the Installation air conditioning split unit. By following this procedure installer will ensure that the installation has been carried out as per contract specifications and manufacturer’s recommendations. The method statement gives details of how the ac installation work will be carried out and the how the… Read More »

Method Statement For Temporary Sheet Piling / Shoring

Before starting the works following equipment shall be arranged. QUY80A Hydraulic Crawler Crane 80t – Lattice boom crawler crane with retractable tracks, suitable for work on a leveled platform. ICE815C Vibratory Hammer with power pack- 1 Nos. Procedure for Temporary Sheet Piling / Shoring The vibratory hammer is a purpose-built hydraulically driven hammer complete with… Read More »