Electrical Power Busbar System Installation Method Statement

This procedure defines the methods to be adopted for the installation of Busbar System. Document ensures that the electrical installation works at site are in compliance with the approved shop drawing and approved material submittal. Scope of this method statement is procedure for Material Delivery Inspection, storage and Installation of Busbar system. During the receiving… Read More »

General Contractor Building Construction Method for Civil Works

This civil work method statement is prepared to ensure that construction of buildings for the project shall comply on plans specifications and all  relevant standard and code requirements in the execution of different work activities to be performed in the construction of buildings and other relevant structures associated with the project in general. In addition… Read More »

Fire Hose Reel & Cabinets Testing and Commissioning Method Statement For Fire Fighting System

This Fire Hose Reel & Cabinets Testing and Commissioning Method Statement is to provide guidance in carrying out and controlling the testing and commissioning of Fire Fighting system for the project, in accordance with the approved Project Quality Plan, contract specifications and Commissioning plan. The Test Involves Testing of Fire Hose Reel, Cabinet and Fire Extinguishers. Necessary… Read More »

Method Statement for Connection of Drainage Pipe Line of Building With Main Line

This Method Statement is to provide guidance in carrying out the connection of drainage pipe line of a project with main drainage lines. Purpose  of  this  method statement is to control and define the construction activities, procedures and other requirements that will be utilized to carrying out the connection of drainage pipe line to the… Read More »

Method Statement for Construction of Non Disruptive Road Crossing NDRC by HDD Drilling Method

Below is a brief method statement for construction of non disruptive road crossing by using the HDD drilling method. List of Equipment, Machinery & Materials HDPE Pipes Drilling Machine Jet Assembly (Drilling head , water tanker & Bentonite mix ) Transmitter, Receiver and Wire line Reamer Tool Welding Machine Towing head Swivel and Polymers Extenders Roles… Read More »

Workplace House Keeping Method for Site Contamination Control

The purpose of this procedure is to provide general guidelines for implementation of controls to reduce the risk of contaminating the workplace and the natural environment. This standards safety instruction applies to all project site workplaces for maintaining good house keeping. Building construction and any other civil engineering works often involve redevelopment of land which… Read More »