The purpose of this procedure is to provide general guidelines for implementation of controls to reduce the risk of contaminating the workplace and the natural environment. This standards safety instruction applies to all project site workplaces for maintaining good house keeping. Building
Read More
This project method statement describes the construction methodology and procedures amidst other details for the actualization of the summary task i.e. site preparation in respect of the subject project for the Engineering, Procurement, Installation and Commissioning (EPIC) of project building. This Method
Read More
This civil work method statement shall address the requirements of project site operations applicable for the supply and placing of structural and nonstructural concrete pouring on the construction work project. Following this method of statement will ensure that concrete works activity will
Read More
In order to ensure quality in all aspects of the construction site, close watch of subcontractors’ operations is no doubt compulsory. Every contractor shall establish and document an appraisal system to verify their sub contractor’s implementation of and conformance to the project
Read More
As required by the contract specifications, the contractor shall establish a test program to ensure that all required testing is properly identified, planned, documented and performed under controlled and suitable environmental conditions, including cleanliness. Such test procedures shall incorporate or reference the
Read More
Contractor’s QC documentation must cover all aspects of quality control program activities, and includes Daily Inspection Reports and Daily Test Reports. After quality control plan QCP approval by the client, the contractor will document the QC activities pursuant to the QCP. Daily
Read More