Below is a comprehensive list of different inspection requirements for receiving storing and installation of different mechanical/HVAC equipment’s. These inspections must be completed throughout the project at its different stages i.e. delivery, storage, installation & pre-commissioning before the functional testing occurs. Delivery
Read More
The purpose of this procedure is to determine the specific gravity and water absorption of given sample of aggregates for road works. Specific gravity of an aggregate is considered to be a measure of strength or quality of the material. Stones having
Read More
Below is best construction method statement that also covers the quality planning at construction site of civil engineering project. Below is list of activities that are covered in this civil contractor method of statement. Excavation work, including soil excavation, soil disposal, backfill
Read More
Construction Terms Beginning With Letter: E EarnestMoney- A sum paid to the seller to show that a potential purchaser is serious about buying. Earthquake Strap- A metal strap used to secure gas hot water heaters to the framing or foundation of a
Read More
In order to ensure quality in all aspects of the construction site, close watch of subcontractors’ operations is no doubt compulsory. Every contractor shall establish and document an appraisal system to verify their sub contractor’s implementation of and conformance to the project
Read More