1. Purpose The purpose of this contract commercial management procedure is to establish the correct administration for the process of Provisional Sums and Nominated Subcontractors for the project. 2. Scope This procedure is applicable for all projects. 3. References Subcontractor and Major
Read More
The purpose of this civil work method statement is to define the procedure for piling construction works at a project in accordance with the requirements specified in the relevant specifications, procedures and drawings, considering safety and quality of the work activities. The
Read More
The document control procedure of any company describes the control mechanisms to ensure that master documents are controlled with regards to their approval, revision, issue level, distribution and use. The control of documents procedure helps to ensure that the company’s environmental, health,
Read More
Generally the design of any water supply system or water treatment process encompasses a broad area. Application of this general guide is dependent upon the type of system or process involved. The design basis for the system including the water source and
Read More
This document describes the methods proposed to be used for the concrete repair activities that will be carried out as part of construction works for any kind of project. During the concrete repairing works quality system will be operated conforming to related
Read More
Table of Content Purpose References Insulation Material Storage Of Materials Preparation Of Insulation Insulation Procedure Final Acceptance Inspection Procedure 1. Purpose The purpose of this method Statement is to describe the execution procedure for the supply and installation of Hot & Personnel
Read More