2024
Aug
31

Method Statement for Installation, Testing & Commissioning of Monospace Elevator

Below is a detailed method statement that covers installation, Testing & Commissioning of Monospace Elevator for any kind of construction project. REQUIRED INSTALLATION TOOLS: Installation power hoist – TIRAK X series 750 kg capacity with pulleys Manual chain pulley block Over Speed

2024
Jun
4

Method Statement For False Ceiling Works Gypsum Board, Beam Grid, Ceiling Tiles & Baffles

The following Method Statement describes the procedure and equipment required for the false ceiling works. Below civil method statement covers following types of false ceilings: Gypsum and Cement Board False Ceiling Beam Grid System False Ceiling Baffle ceiling Ceiling Tiles, 600 x