This Method Statement is to provide guidance in carrying out the connection of drainage pipe line of a project with main drainage lines. Purpose of this method statement is to control and define the construction activities, procedures and other requirements that will
Read More
Below is a brief method statement for construction of non disruptive road crossing by using the HDD drilling method. List of Equipment, Machinery & Materials HDPE Pipes Drilling Machine Jet Assembly (Drilling head , water tanker & Bentonite mix ) Transmitter, Receiver and
Read More
This project method statement describes the construction methodology and procedures amidst other details for the actualization of the summary task i.e. site preparation in respect of the subject project for the Engineering, Procurement, Installation and Commissioning (EPIC) of project building. This Method
Read More
The purpose of this civil work method statement is to define the procedure for piling construction works at a project in accordance with the requirements specified in the relevant specifications, procedures and drawings, considering safety and quality of the work activities. The
Read More
This civil work method statement shall address the requirements of project site operations applicable for the supply and placing of structural and nonstructural concrete pouring on the construction work project. Following this method of statement will ensure that concrete works activity will
Read More
In order to ensure quality in all aspects of the construction site, close watch of subcontractors’ operations is no doubt compulsory. Every contractor shall establish and document an appraisal system to verify their sub contractor’s implementation of and conformance to the project
Read More