Below method statement covers the above ground drainage installation activities. By following this procedure contractor shall ensure that the installation of drainage piping has been carried out as per project contract requirements, specifications and best practices. It gives details of how the
Read More
The following Method Statement describes the procedure and equipment required for the false ceiling works. Below civil method statement covers following types of false ceilings: Gypsum and Cement Board False Ceiling Beam Grid System False Ceiling Baffle ceiling Ceiling Tiles, 600 x
Read More
This method statement is applicable for the installation of wet riser pipes, hose reels, related fittings and accessories. Following this standard procedure shall ensure that the firefighting pipe work and other related fittings and accessories are properly installed and conforms to the
Read More
1. What is the difference between working stress approach and limit state approach? For working stress approach, service loads are used in the whole design and the strength of material is not utilized in the full extent. In this method of design,
Read More
The purpose of this method statement is to make sure that hydrostatic pressure testing of spherical tanks is done safely as per client requirements, specifications and applicable local and international standards. Method statement is applicable for saturated and unsaturated LPG storage and
Read More
This method statement explains and covers the installation & inspection of cast resin Transformers but can be useful for other types of transformers. The electrical standard procedure can be used for any kind of construction project covering the electrical scope of work.
Read More