Bituminous Roads, Kerbs, Tiles and Paver Block Installation Method Statement

Bituminous Roads, Kerbs, Tiles and Paver Block Installation Method Statement

This method statement represents the proposed construction procedure for the bituminous roads, kerbs, tiles and paver block installation activities. It is the overall responsibility of the project manager for road work, to ensure that the site preparation activities and safety requirements are

2025
Aug
8

Construction of Concrete Plinths for Blowers, Backwash Pumps and Transfer Pumps

Construction of concrete plinths for the Blowers, Backwash Pumps and Transfer Pumps

This method statement provide details and procedures which will and is to be followed for the successful construction of concrete plinths for the Blowers, Backwash Pumps and Transfer Pumps in the Machine Room. The Supervision of the installation will be done by

2025
Aug
7

Project Management Procedure for Managing Provisional Sum and Nominated Subcontractors

1. Purpose The purpose of this contract commercial management procedure is to establish the correct administration for the process of Provisional Sums and Nominated Subcontractors for the project. 2. Scope This procedure is applicable for all projects. 3. References Subcontractor and Major

2025
Aug
3

Document Control Procedure for Manual & Electronic Document Management System

Document Control Procedure for Quality Management System

The document control procedure of any company describes the control mechanisms to ensure that master documents are controlled with regards to their approval, revision, issue level, distribution and use. The control of documents procedure helps to ensure that the company’s environmental, health,