2024
Jan
8

Job Safety Analysis For Screeding Civil Works & Download Link

Job Safety Analysis For Screeding Civil Works

Activity: Use of electrical equipment’s Hazards & Risks: Electrical Shock, Cables management issues, Personal Injury Control Measures: – Fire exit routes / Muster points shall be properly indicated by installation of signs. – Working areas shall be barricaded (only authorized personnel are

2023
Sep
12

Method Statement for Drainage & Sewage Works

Method Statement for Drainage & Sewage Works

The purpose of this plumbing method statement is to define the procedure for the preparation and construction of gravity sewer lines with GRP pipes with associated inspection chambers, manholes in accordance with the requirements specified in the relevant specifications 0considering safety and

2023
Aug
22

Roadworks Road Construction Method Statement

Roadworks Road Construction Method Statement

Below work method statement outlines the steps to apply and lay pavement for the road construction consisting sub-base of granular material, road base of crusher run, asphaltic concrete binder course and asphaltic concrete wearing course. Method statement shall apply for all roadworks

2023
Jul
15

Construction Noise Control Measures, Plan and Procedure

Construction Noise Control Measures, Plan and Procedure

This health and safety instruction provides information on the noise hazards and control measures regarding noise in the workplace with the view to prevent industrial hearing loss. The safety procedure is applicable for all kind of projects. Additional control measures may be

error: Content is protected !!