Woven Vinyl Flooring installation works shall be completed as per details, pattern & design shown on the approved shop drawings and manufacturer’s recommendations. Visual appearance shall be consistence throughout and the vinyl flooring material shall be free from all defects like discoloration
Read More
Below is a precise method of statement covering the GRP lining and ladder installation in water tank. There shall be many other sections like scope of work, responsibilities references etc. but we have given below only the specific installation steps. Following tools
Read More
The following Method Statement describes the procedure and equipment required for the false ceiling works. Below civil method statement covers following types of false ceilings: Gypsum and Cement Board False Ceiling Beam Grid System False Ceiling Baffle ceiling Ceiling Tiles, 600 x
Read More
Before starting the works following equipment shall be arranged. QUY80A Hydraulic Crawler Crane 80t – Lattice boom crawler crane with retractable tracks, suitable for work on a leveled platform. ICE815C Vibratory Hammer with power pack- 1 Nos. Procedure for Temporary Sheet Piling
Read More
General Requirements: Formwork shall be so constructed that it will support the loads imposed on it by fresh concrete together with additional stresses imposed by vibrating equipment and by construction traffic. For the construction of structural floor slabs formwork shall be used
Read More
Following equipment shall be arranged before starting the work. Lifting Equipment: Chain block / Lever Block is used to lifting the beams at the installation area. Usually use to help workers to lift the beams at low level height before fixing the connection bolts
Read More