2020
Sep
1

Construction Project Site Field Testing Procedures

As required by the contract specifications, the contractor shall establish a test program to ensure that all required testing is properly identified, planned, documented and performed under controlled and suitable environmental conditions, including cleanliness. Such test procedures shall incorporate or reference the

2020
Aug
5

Construction Project Documentation Procedure

Contractor’s QC documentation must cover all aspects of quality control program activities, and includes Daily Inspection Reports and Daily Test Reports. After quality control plan QCP approval by the client, the contractor will document the QC activities pursuant to the QCP. Daily

2020
Jun
30

Design of Temporary Works for Completing Permanent Works on Projects

Design of Temporary Works on Construction Projects

This procedure describes the requirements on the design of temporary works. The purpose of this procedure is to provide adequate drawings and method statements for the temporary works that are necessary for the completion of the permanent works. The design and /

2020
Jan
17

Safe Work Method Statement & Risk Assessment for Excavation and Trenching

Safe Work Method Statement for Excavation and Trenching

This safe work method statement SWMS details how specific risks associated with excavation, trenching and the location of underground services are to be managed and controlled. It outlines the common risks and dangers associated with this work and how to best control