REQUIRED EQUIPMENT: Equipment / Specializing Tooling: Mobile crane 50 ton,25 ton and 200 ton Flat bed Lorries Safety harnesses, Helmet Chain blocks, power tools as required Fire fighting and safety equipments i.e. Fire Extinguisher etc. Materials Bolts and pins Anchor bolts Precast
Read More
Following tools or equipment shall be arranged before starting the work. Crane – 200 to 300T : 1 No. Tower cranes at site Flat bed trailer : 1 No. Scaffolding (with green tag) Gas Cutting sets : 2 Nos. Welding set :
Read More
The following equipment and tools shall be provided with the necessary numbers to suit the numbers of skilled fixers: Leveling Instruments Masonry Tools Brushes Rubber Mallets Spirit Levels Adjustable Wrenches Open Wrenches Stone Steel Holders Spatulas Aluminum Straight Edge Measurement Tapes Stone
Read More
All painting works shall be carried out strictly in accordance with approved paint manufacturer’s recommendations and relevant applicable standards. Application of Painting system to the internal/external surfaces shall be as approved by the CONSULTANT and as required in compliance with manufacturer’s recommendations,
Read More
Lifting Equipment: Chain block / Lever Block used to lifting the beams at the installation area. Usually use to help workers to lift the beams at low level height before fixing the connection bolts the same also for aligning the connection of the
Read More
This method statement covers the laying of Dense Bituminous Macadam (DBM) in 50 to 100 mm thick layers as profile correction course (PCC) on a previously prepared existing concrete surface as per specified lines & grades. The road construction works shall comply
Read More