As required by the contract specifications, the contractor shall establish a test program to ensure that all required testing is properly identified, planned, documented and performed under controlled and suitable environmental conditions, including cleanliness. Such test procedures shall incorporate or reference the
Read More
Contractor’s QC documentation must cover all aspects of quality control program activities, and includes Daily Inspection Reports and Daily Test Reports. After quality control plan QCP approval by the client, the contractor will document the QC activities pursuant to the QCP. Daily
Read More
This procedure describes the requirements on the design of temporary works. The purpose of this procedure is to provide adequate drawings and method statements for the temporary works that are necessary for the completion of the permanent works. The design and /
Read More
The purpose of this method statement is to define the procedure for the preparation of pile caps before starting of the waterproofing and the pile head treatment. The sequence of work shall be Piling , Dewatering, Excavation to remove the soil and
Read More
Below is a detailed procedure for construction of pipe culverts for any kind of road or pavement project. Detailed working drawing will be prepared & submitted for approval for each and every culvert pipe works. After the site has been surveyed, the
Read More
This safe work method statement SWMS details how specific risks associated with excavation, trenching and the location of underground services are to be managed and controlled. It outlines the common risks and dangers associated with this work and how to best control
Read More