This document defines the method statement for the installation of AHU at construction site in compliance with the approved designs and approved material submittals. Prior to installation of AHU, the supervisor and foreman will verify and ensure that all the safety requirements have been complied with and
Read More
This Fire Hose Reel & Cabinets Testing and Commissioning Method Statement is to provide guidance in carrying out and controlling the testing and commissioning of Fire Fighting system for the project, in accordance with the approved Project Quality Plan, contract specifications and
Read More
This air conditioning method statement is developed for any kind of the project in order to achieve best quality of work at all levels for ac installation activity. Method Statement covers all the critical installation activities of air conditioning systems that includes
Read More
Below is a brief HVAC method statement that covers the Installation air conditioning split unit. By following this procedure installer will ensure that the installation has been carried out as per contract specifications and manufacturer’s recommendations. The method statement gives details of
Read More
Table of Content Purpose References Insulation Material Storage Of Materials Preparation Of Insulation Insulation Procedure Final Acceptance Inspection Procedure 1. Purpose The purpose of this method Statement is to describe the execution procedure for the supply and installation of Hot & Personnel
Read More
This method of statement is applicable for the installation of Natural Gas System, pipe work, distribution lines, gas branches inside the retails of the Building (regulators, gas meters, valves, etc.) for the building project. Project manager will have the overall responsibility of
Read More