Laying of Dense Bituminous Macadam DBM – Road Construction

This method statement covers the laying of Dense Bituminous Macadam (DBM) in 50 to 100 mm thick layers as profile correction course (PCC) on a previously prepared existing concrete surface as per specified lines & grades. The road construction works shall comply the contract agreement, project specifications, relevant drawings and applicable local and international standards.… Read More »

HVAC Ducting Outlets Grills and Diffusers Installation Method Statement

Below is a precise method statement that covers the installation of HVAC Ducting Outlets i.e. Grills and Diffusers. Scope of work includes all the ductwork for the project covering the outlets as per the approved schedule. Project manager is overall responsible for the control of all related activities including the quality of work and health… Read More »

Method Statement for Drainage & Sewage Works

The purpose of this plumbing method statement is to define the procedure for the preparation and construction of gravity sewer lines with GRP pipes with associated inspection chambers, manholes in accordance with the requirements specified in the relevant specifications 0considering safety and quality of the work activities. Scope of work may cover any length of… Read More »

Roadworks Road Construction Method Statement

Below work method statement outlines the steps to apply and lay pavement for the road construction consisting sub-base of granular material, road base of crusher run, asphaltic concrete binder course and asphaltic concrete wearing course. Method statement shall apply for all roadworks related with a road construction project. The intention of this work method statement… Read More »

Construction Noise Control Measures, Plan and Procedure

This health and safety instruction provides information on the noise hazards and control measures regarding noise in the workplace with the view to prevent industrial hearing loss. The safety procedure is applicable for all kind of projects. Additional control measures may be required depending on project and country local legal occupational health and safety requirements… Read More »

Road Maintenance Method Statement Including Cracks Potholes Patches Edge Breaks

Contractor will carry out the road maintenance and construction works in compliance with the technical specification and engineer’s instructions. With the direction and instruction of the client/ consulting engineer, at the designated areas, the motor graders and excavators are used to clear, remove, and dispose all vegetation, silt and grubbing roots, down timber and other… Read More »