Method Statement for Plastering Works

Below is a standard method statement for plastering works, which must be followed for any kind of project. Any suitable location can be designated by the client/consultant for the construction of Mock Up, prior to start the actual work in order to obtain final approval. Approved mock-up may remain as part of the completed works.… Read More »

Method Statement for Tiling Work Installation of Ceramic, Porcelain & Agglomerate Tiles

Below is step wise civil work method statement for tile fixing and installation of ceramic, porcelain & agglomerate tiling works for any kind of building projects. Following is list of necessary equipment’s and tools that are mandatory for the tiling work: Drum mixer Grinder/saw or wet diamond table masonry cutter Aluminum straight edge Trowel Plumb… Read More »

Method Statement for Screeds/Topping Operation Above Water Proofing in Toilet, Roof Slab and Raft Slab

The purpose of this procedure is to define how screeds/toppings shall be carried out under controlled condition. This method statement covers the detailed procedure to be followed for screeds/topping operation above water proofing in toilet, roof slab and raft slab. Method statement also covers the Screeding operation below tiling works in concrete slabs wherever necessary. This… Read More »

Drainage Vacuum System Installation and Testing Method Statement

Before start of drainage system piping installation and testing completeness of the related works and systems shall be ensured by physical inspections and interpreting the previously submitted and approved work inspection reports/records. Make sure that all tools/equipment/instruments required are calibrated and having valid certificate. Safe access to work areas shall be provided and shall be… Read More »

Chilled Water Pipe Installation & Testing Method of Statement

Below is a brief mechanical HVAC method statement that covers the installation of chilled water CHW piping system. This procedure defines the method used to ensure that the piping installation has been carried out as per contract requirements and best practices. Also it gives details of how the work will be carried out and how… Read More »

Construction Methodology for Building Construction Project Civil Work

The purpose of this construction methodology is to specify the requirements of civil building construction activities including excavation, backfilling, and allied activities complying with the contract documents, project specifications as per the scope of work and approved drawings/documents. This method statement also covers requirements for earthworks associated with trenches for pipelines or service ducts etc.… Read More »