The objectives of this method statement is to briefly describe the major activities and set inspection milestones for irrigation system installation. Purpose of this procedure is to establish general guidelines addressing major requirements that are necessary to ensure that irrigation work conforms
Read More
This procedure defines the methods to be adopted for the installation of Busbar System. Document ensures that the electrical installation works at site are in compliance with the approved shop drawing and approved material submittal. Scope of this method statement is procedure
Read More
This document describes the methods proposed to be used for the concrete repair activities that will be carried out as part of construction works for any kind of project. During the concrete repairing works quality system will be operated conforming to related
Read More
This method of statement is applicable for the installation of Natural Gas System, pipe work, distribution lines, gas branches inside the retails of the Building (regulators, gas meters, valves, etc.) for the building project. Project manager will have the overall responsibility of
Read More
This civil work method statement is prepared to ensure that construction of buildings for the project shall comply on plans specifications and all relevant standard and code requirements in the execution of different work activities to be performed in the construction of
Read More
This Fire Hose Reel & Cabinets Testing and Commissioning Method Statement is to provide guidance in carrying out and controlling the testing and commissioning of Fire Fighting system for the project, in accordance with the approved Project Quality Plan, contract specifications and
Read More