Underground Drainage Piping Installation Method Statement

Connection of Drainage Pipe Line method statement

This Method Statement covers the installation of uPVC and HDPE pipes for use with the underground and substructure drainage piping systems. Procedure defines the method used to ensure the underground drainage pipework installation has been carried out as per technical specifications and

2022
May
5

Mechanical Equipment Inspection Checklists During Construction Project Lifecycle

Below is a comprehensive list of different inspection requirements for receiving storing and installation of different mechanical/HVAC equipment’s. These inspections must be completed throughout the project at its different stages i.e. delivery, storage, installation & pre-commissioning before the functional testing occurs. Delivery

2022
Mar
15

Method Statement for Building Construction Civil Engineering Project

Below is best construction method statement that also covers the quality planning at construction site of civil engineering project. Below is list of activities that are covered in this civil contractor method of statement. Excavation work, including soil excavation, soil disposal, backfill