This electrical safework method statement describes the management arrangements and system of work to adopted for the laying cable for the electrical project. Below is necessary tools & equipment for performing the site activities for laying the cable. Cable Rollers Cable Pulling
Read More
This Work Method Statement (WMS) is to describe the method for the CO2 fire suppression system installation & pressure testing for any kind of a project. The aim and /or benefit of complying with this method of statement includes the project specifications
Read More
Were the project objectives (expected outcomes) Accomplished? Explanation if required Were all Deliverable submitted and accepted? Explanation if required Did the Client/Engineer verify that all deliverable met the requirements? Explanation if required Have all subcontracts been closed? Explanation if required Have all final payments been made? (i.e., invoices
Read More
The following equipment and tools shall be provided with the necessary numbers to suit the numbers of skilled fixers: Leveling Instruments Masonry Tools Brushes Rubber Mallets Spirit Levels Spatulas Aluminum Straight Edge Measurement Tapes Stone Cutting Machine/Power Saw Plumb Line and Plastic
Read More
REQUIRED EQUIPMENT / MACHINERY: Hydraulic Power Pack, HILTI DLP 30 : 2 Nos. Hydraulic Saw Head, HILTI DSTS 30 : 2 Nos. Hydraulic Hoses (set of 6 hoses) : 2 Nos. Remote Control : 2 Nos. Coring Machines HILTI DD250 : 2
Read More
REQUIRED EQUIPMENT: Equipment / Specializing Tooling: Mobile crane 50 ton,25 ton and 200 ton Flat bed Lorries Safety harnesses, Helmet Chain blocks, power tools as required Fire fighting and safety equipments i.e. Fire Extinguisher etc. Materials Bolts and pins Anchor bolts Precast
Read More