CO– An abbreviation for “Certificate of Occupancy“. This certificate is issued by the local municipality and is required before anyone can occupy and live within the home. It is issued only after the local municipality has made all inspections and allmonies and
Read More
This document defines the method statement for the installation of AHU at construction site in compliance with the approved designs and approved material submittals. Prior to installation of AHU, the supervisor and foreman will verify and ensure that all the safety requirements have been complied with and
Read More
A/C– An abbreviation for air conditioner or air conditioning. A/C Condenser– The outside fan unit of the Air Conditioning system. It removes the heat from the Freon gas and “turns” the gas back into a liquid and pumps the liquid back to
Read More
For the design of bridges foundation, the scope of subsurface exploration shall be to determine soil parameters and rock characteristics and their suitability by insitu testing or testing of samples/cores taken out of exploration. It shall be planned in such a way
Read More
Below is a precise method statement for erection and welding of vertical Bracing for steel buildings and structures as per the project requirements. Sequence of activities for Bracing Erection are as follows Receiving material from stores and temporarily stacking them if necessary
Read More
This procedure defines the requirements for gabion wall basket or mattress installation works, in order to maintain the soil stability for any kind of installations including landscaping and pipe works etc. Where multiple activities are scheduled, the general contractor is to review
Read More