Project Close Out Report / Checklist – Template

Were the project objectives (expected outcomes) Accomplished? Explanation if required Were all Deliverable submitted and accepted? Explanation if required Did the Client/Engineer verify that all deliverable met the requirements? Explanation if required Have all subcontracts been closed? Explanation if required Have all final payments been made? (i.e., invoices paid) Explanation if required Have all the project resources been relocated? Explanation if required Have… Read More »

Method Statement For Installation Of Hardscape Works

The following equipment and tools shall be provided with the necessary numbers to suit the numbers of skilled fixers: Leveling Instruments Masonry Tools Brushes Rubber Mallets Spirit Levels Spatulas Aluminum Straight Edge Measurement Tapes Stone Cutting Machine/Power Saw Plumb Line and Plastic Strings Steel Hammers Masking Tapes, etc. as required Method Statement For Hardscape Works: Execution… Read More »

Method Statement For Tower Crane Erection & Management

REQUIRED EQUIPMENT: Equipment / Specializing Tooling: Mobile crane 50 ton,25 ton and 200 ton Flat bed Lorries Safety harnesses, Helmet Chain blocks, power tools as required Fire fighting and safety equipments i.e. Fire Extinguisher etc. Materials Bolts and pins Anchor bolts Precast counter weight blocks PROCEDURE FOR TOWER CRANE INSTALLATION: GENERAL INSTRUCTION FOR ERECTION: All… Read More »

Method Statement for Installation of Stone Cladding Works

The following equipment and tools shall be provided with the necessary numbers to suit the numbers of skilled fixers: Leveling Instruments Masonry Tools Brushes Rubber Mallets Spirit Levels Adjustable Wrenches Open Wrenches Stone Steel Holders Spatulas Aluminum Straight Edge Measurement Tapes Stone Cutting Machine/Power Saw Plumb Line and Plastic Strings Steel Hammers Masking Tapes, etc.… Read More »