2021
Feb
12

Method Statement for Construction of Non Disruptive Road Crossing NDRC by HDD Drilling Method

Method Statement for Construction of Non Disruptive Road Crossing by HDD Drilling Method

Below is a brief method statement for construction of non disruptive road crossing by using the HDD drilling method. List of Equipment, Machinery & Materials HDPE Pipes Drilling Machine Jet Assembly (Drilling head , water tanker & Bentonite mix ) Transmitter, Receiver and

2020
Dec
31

Workplace House Keeping Method for Site Contamination Control

Workplace House Keeping Method for Site Contamination Control

The purpose of this procedure is to provide general guidelines for implementation of controls to reduce the risk of contaminating the workplace and the natural environment. This standards safety instruction applies to all project site workplaces for maintaining good house keeping. Building

2020
Dec
15

Piping Insulation and Jacketing Method Statement

Piping Insulation Procedure and Jacketing Method Statement

Table of Content Purpose References Insulation Material Storage Of Materials Preparation Of Insulation Insulation Procedure Final Acceptance Inspection Procedure 1. Purpose The purpose of this method Statement is to describe the execution procedure for the supply and installation of Hot & Personnel

2020
Dec
1

Site Preparation and Mobilization Method Statement

Site Preparation and Mobilization Method Statement

This project method statement describes the construction methodology and procedures amidst other details for the actualization of the summary task i.e. site preparation in respect of the subject project for the Engineering, Procurement, Installation and Commissioning (EPIC) of project building. This Method

2020
Oct
10

Concrete Pouring Method Statement for Construction Work using Ready Mix Concrete

This civil work method statement shall address the requirements of project site operations applicable for the supply and placing of structural and nonstructural concrete pouring on the construction work project. Following this method of statement will ensure that concrete works activity will