This method statement covers the nature and type of work for water supply piping system Pipes & Fittings installation and Testing as per site requirements for any kind of the project. All documentary requirements for this plumbing procedure will be submitted for
Read More
Below method statement covers the above ground drainage installation activities. By following this procedure contractor shall ensure that the installation of drainage piping has been carried out as per project contract requirements, specifications and best practices. It gives details of how the
Read More
This method statement is applicable for the installation of wet riser pipes, hose reels, related fittings and accessories. Following this standard procedure shall ensure that the firefighting pipe work and other related fittings and accessories are properly installed and conforms to the
Read More
The purpose of this method statement is to make sure that hydrostatic pressure testing of spherical tanks is done safely as per client requirements, specifications and applicable local and international standards. Method statement is applicable for saturated and unsaturated LPG storage and
Read More
Dewatering is defined as the removal of the ground water to a level below the normal water table, to enable excavation and construction to be carried out in suitable and safe working condition. It is proposed to install a single-stage well point
Read More
This Work Method Statement (WMS) is to describe the method for the CO2 fire suppression system installation & pressure testing for any kind of a project. The aim and /or benefit of complying with this method of statement includes the project specifications
Read More